Two pictures, workers standing in front of an electrical system and an external shot, with a crane preparing to lift.

Working down in a mine can get very cold. Keeping workers safe is a priority. Arcadian’s Industrial Mechanical team worked with Sifto Salt to connect and commission their new 50 million BTU heater. It heats the air that goes down into the mine, reducing the icing risk and preventing a large number of problems that are associated with that.